Project Description

City of Santa Monica, Fire Station No. 1, Santa Monica, CA

Project Description

Cumming provided construction management services to the City of Santa Monica for their Fire Station No. 1 replacement project. The previous Fire Station No. 1 did not meet existing seismic codes nor the city’s future requirements. The new station is 28,690 sq. ft. in total size, spread over two stories, with a 18,348-sq.-ft. basement and subterranean parking garage. The $28 million project also included seven apparatus bays, offices, equipment storage and repair rooms, 20 dorm rooms, a four-stop elevator, showers, a kitchen, a workout room, and exterior decks on the second floor, as well as alley repaving, installation of a deep-well stormwater infiltration system, and landscaping. The station is equipped with diesel and unleaded gasoline storage tanks along with a diesel emergency generator.

Project Details

Service(s): Construction Management
Sector(s): Industrial
Office(s): Los Angeles
ENTITY: Cumming